SDI Lab Knowledge capture Demo on a made-up company's notes (Bergwerk Präzision AG). Anything added here is visible to other visitors. A pause ends after 5 minutes, so no one can block the demo. Resets every night at 03:30. Capturing

Onboarding note: your first week in production

Onboarding note from 12.10.2026. Captured 0 decisions and 0 actions; mentions 5 people and 4 projects.

People mentioned

Projects

Original text

Date: 2026-10-12
Type: Onboarding note
Author: Lukas Brunner

Welcome to Bergwerk Präzision AG. This note tells new production staff where things are and whom to ask.

Whom to ask

  • Shift plans and line assignments: Lukas Brunner.
  • Spindles, calibration, anything that sounds wrong on a machine: Nina Frei (until 30.11.2026, then Lukas Brunner).
  • Inspection plans, material certificates, measuring equipment: Thomas Huber.
  • Steel and other material: Elena Rossi. Our main steel supplier changes to Stahl Nord in January 2027.
  • Computer accounts and the ERP: Reto Ammann. We move from BW-Classic to NovaERP in January 2027.

Rules that matter on day one

  1. No material without a 3.1 certificate goes on a machine. If a label says "quarantine", leave the material alone and call Quality.
  2. Line 3 runs titanium for medical customers. Every first part after a tool change goes to Quality.
  3. Write down what you change on a machine in the maintenance log, even small things.

What is happening this autumn

  • Line 3 is stopped from 02.11. to 13.11.2026 for the retrofit (#line-3-retrofit).
  • The ISO 9001 recertification audit is on 24 and 25 November 2026 (#iso-recertification).