[1] Line 3 runs at 80 % feed rate in the first week after the restart Added by a visitor
Decided on 28.10.2026 in Line 3 retrofit: check-in before the stop (added by a visitor in this demo). Why: • the new controls and the new bearings need a running-in period before full speed.
Open note -
[2] Line 3 retrofit: check-in before the stop Added by a visitor
Aarmatic delivered the new controls. The bearing swap on all four spindles is planned for the first three days of the retrofit window. Decision: Line 3 runs at 80 % feed rate in the first week after the restart. Why: the new controls and the new bearings need a running-in period before full speed.
Open note -
[3] Onboarding note: your first week in production · Rules that matter on day one
1. No material without a 3.1 certificate goes on a machine. If a label says "quarantine", leave the material alone and call Quality. 2. Line 3 runs titanium for medical customers. Every first part after a tool change goes to Quality. 3. Write down what you change on a machine in the maintenance log, even small things.