Decided on 28.10.2026 in Line 3 retrofit: check-in before the stop (added by a visitor in this demo).
Why
- the new controls and the new bearings need a running-in period before full speed.
Project
People
- Lukas Brunner, Head of Production
- Thomas Huber, Quality Manager
- Nina Frei, Senior Maintenance Engineer