Ask
Answers come from the notes, with the source of every passage.
Answer
No AI model in this demo: these are the best-matching passages from the notes. On a real install, a model writes the answer from these citations.-
[1] Spindle checks on Line 3 happen every month and after every crash, using Nina's five steps: warm-up, reference mandrel, runout, vibration, log
Decided on 19.10.2026 in Knowledge handover: Nina Frei, maintenance.
Open note -
[2] Knowledge handover: Nina Frei, maintenance · Things only Nina knew
Decision: Lukas Brunner takes over maintenance planning for all lines from 01.12.2026. Decision: Spindle checks on Line 3 happen every month and after every crash, using Nina's five steps: warm-up, reference mandrel, runout, vibration, log. • Action: @Nina Frei record a short video of the calibration with the reference mandrel (due 2026-11-20) • Action: @Lukas Brunner shadow Nina Frei during the bearing swap in the retrofit window (due 2026-11-13) • Action: @Thomas Huber add the monthly spindle check to the maintenance plan (due 2026-11-27)
Open note -
[3] Line 3 retrofit: check-in before the stop Added by a visitor
• Action: @Nina Frei hand over the sensor alarm thresholds to Lukas Brunner (due 2026-11-13) • Action: @Thomas Huber inspect the first five parts after the restart (due 2026-11-17) • Action: @Lukas Brunner tell Novamed about the lower output in week 47 (due 2026-11-09)
Open note