[1] Onboarding note: your first week in production
Welcome to Bergwerk Präzision AG. This note tells new production staff where things are and whom to ask.
Open note -
[2] Onboarding note: your first week in production · What is happening this autumn
• Line 3 is stopped from 02.11. to 13.11.2026 for the retrofit (#line-3-retrofit). • The ISO 9001 recertification audit is on 24 and 25 November 2026 (#iso-recertification).
Open note -
[3] Stahl Nord onboarding call Added by a visitor
Call with Mario Gerber, account manager at Stahl Nord, about the first regular deliveries in January. Decision: Stahl Nord sends the 3.1 certificate electronically with the delivery note, so goods receipt can check it before unloading. Why: after TCK-0457 we want the certificate before the material is in the building. • Action: @Reto Ammann set up electronic delivery notes from Stahl Nord in NovaERP (due 2026-12-11) • Action: @Elena Rossi agree the January delivery schedule with Stahl Nord (due 2026-11-20)
Open note -
[4] Line 3 runs at 80 % feed rate in the first week after the restart Added by a visitor
Decided on 28.10.2026 in Line 3 retrofit: check-in before the stop (added by a visitor in this demo). Why: • the new controls and the new bearings need a running-in period before full speed.
Open note -
[5] Stahl Nord sends the 3.1 certificate electronically with the delivery note, so goods receipt can check it before unloading Added by a visitor
Decided on 28.10.2026 in Stahl Nord onboarding call (added by a visitor in this demo). Why: • after TCK-0457 we want the certificate before the material is in the building.
Open note