[1] Lukas Brunner takes over maintenance planning for all lines from 01.12.2026
Decided on 19.10.2026 in Knowledge handover: Nina Frei, maintenance.
Open note -
[2] Knowledge handover: Nina Frei, maintenance · Things only Nina knew
Decision: Lukas Brunner takes over maintenance planning for all lines from 01.12.2026. Decision: Spindle checks on Line 3 happen every month and after every crash, using Nina's five steps: warm-up, reference mandrel, runout, vibration, log. • Action: @Nina Frei record a short video of the calibration with the reference mandrel (due 2026-11-20) • Action: @Lukas Brunner shadow Nina Frei during the bearing swap in the retrofit window (due 2026-11-13) • Action: @Thomas Huber add the monthly spindle check to the maintenance plan (due 2026-11-27)
Open note -
[3] Retrofit Line 3 instead of buying a new machining centre
Decided on 20.04.2026 in Line 3 retrofit: planning meeting. Why: • the retrofit costs about a third of a new machine, and Line 3 is back in production after two weeks instead of nine months.