Decided on 20.04.2026 in Line 3 retrofit: planning meeting.
Why
- the retrofit costs about a third of a new machine, and Line 3 is back in production after two weeks instead of nine months.
Project
People
- Sandra Meier, CFO
- Lukas Brunner, Head of Production
- Thomas Huber, Quality Manager
- Nina Frei, Senior Maintenance Engineer