  1. [1] Stahl Nord onboarding call Added by a visitor
    Call with Mario Gerber, account manager at Stahl Nord, about the first regular deliveries in January. Decision: Stahl Nord sends the 3.1 certificate electronically with the delivery note, so goods receipt can check it before unloading. Why: after TCK-0457 we want the certificate before the material is in the building. • Action: @Reto Ammann set up electronic delivery notes from Stahl Nord in NovaERP (due 2026-12-11) • Action: @Elena Rossi agree the January delivery schedule with Stahl Nord (due 2026-11-20)
    Open note
  2. [2] Stahl Nord sends the 3.1 certificate electronically with the delivery note, so goods receipt can check it before unloading Added by a visitor
    Decided on 28.10.2026 in Stahl Nord onboarding call (added by a visitor in this demo). Why: • after TCK-0457 we want the certificate before the material is in the building.
    Open note
  3. [3] TCK-0457: Stahl Nord trial order delivered without 3.1 certificate · What we did
    • Goods receipt booked the bars as blocked stock with the label "quarantine: certificate missing". • Elena Rossi called Stahl Nord; the certificate came by email two days later and the material was released. Decision: Any delivery that arrives without a 3.1 material certificate goes into quarantine (blocked stock); nobody uses the material until Quality has checked the certificate. Why: medical customers audit our material traceability; one part without a certificate can cost us the customer.
    Open note
  4. [4] Weekly production meeting · Stahl Nord #stahl-nord-switch
    Elena Rossi: the contract is with the lawyer, signature expected in October. The first regular delivery is planned for 05.01.2027.
    Open note
  5. [5] Onboarding note: your first week in production · Rules that matter on day one
    1. No material without a 3.1 certificate goes on a machine. If a label says "quarantine", leave the material alone and call Quality. 2. Line 3 runs titanium for medical customers. Every first part after a tool change goes to Quality. 3. Write down what you change on a machine in the maintenance log, even small things.
    Open note