Answer
No AI model in this demo: these are the best-matching passages from the notes. On a real install, a model writes the answer from these citations.-
[1] Any delivery that arrives without a 3.1 material certificate goes into quarantine (blocked stock); nobody uses the material until Quality has checked the certificate
Decided on 07.10.2026 in TCK-0457: Stahl Nord trial order delivered without 3.1 certificate. Why: • medical customers audit our material traceability; one part without a certificate can cost us the customer.
Open note -
[2] Onboarding note: your first week in production · Rules that matter on day one
1. No material without a 3.1 certificate goes on a machine. If a label says "quarantine", leave the material alone and call Quality. 2. Line 3 runs titanium for medical customers. Every first part after a tool change goes to Quality. 3. Write down what you change on a machine in the maintenance log, even small things.
Open note -
[3] TCK-0457: Stahl Nord trial order delivered without 3.1 certificate · Problem
The second trial order from Stahl Nord (1.4404 round bar, 18 mm, 1.2 tonnes) arrived without the 3.1 material certificate. Without the certificate we may not use the material for medical parts.
Open note -
[4] Supplier review: steel bar stock · Where we stand with Acier Léman
Acier Léman SA has supplied our steel bar stock since 2014. In the first half of 2026: • 9 of 22 deliveries were late, on average by 6 working days. • Two deliveries came without the 3.1 material certificate; Thomas Huber had to block the material until the papers arrived. • They announced a price increase of 14 % from January 2027. Lukas Brunner: the late deliveries caused two weekend shifts on Line 2 in May.
Open note -
[5] TCK-0457: Stahl Nord trial order delivered without 3.1 certificate · What we did
• Action: @Elena Rossi add the certificate-with-every-delivery rule to the Stahl Nord framework contract as an annex (due 2026-10-31) • Action: @Thomas Huber add the quarantine step to the goods-receipt work instruction (due 2026-11-06)
Open note