--- type: "source" title: "TCK-0412: Line 3 spindle 2 vibration and surface marks" date: "2026-05-18" kind: "Production ticket" file: "sources/2026-05-18-ticket-tck-0412-spindle-vibration.md" added: false decisions: 1 actions: 2 tags: ["source"] --- # TCK-0412: Line 3 spindle 2 vibration and surface marks Production ticket from 18.05.2026. Captured 1 decision and 2 actions; mentions 3 people and 1 project. ## Decisions - [[decisions/2026-05-18-replace-the-bearings-on-all-four-spindles-of-line-3-during|Replace the bearings on all four spindles of Line 3 during the retrofit window, not one…]] ## Actions - [x] [[people/elena-rossi|Elena Rossi]]: Order eight spare spindle bearings (due 12.06.2026) · [[projects/line-3-retrofit|Line 3 retrofit]] - [x] [[people/nina-frei|Nina Frei]]: Add the vibration readings to the maintenance log (due 29.05.2026) · [[projects/line-3-retrofit|Line 3 retrofit]] ## People mentioned - [[people/elena-rossi|Elena Rossi]] - [[people/thomas-huber|Thomas Huber]] - [[people/nina-frei|Nina Frei]] ## Projects - [[projects/line-3-retrofit|Line 3 retrofit]] ## Original text Date: 2026-05-18 Type: Production ticket Reporter: Thomas Huber Assignee: Nina Frei Status: Closed Tags: #line-3-retrofit #### Problem Quality found chatter marks on 14 titanium bone screws (order 26-1187). The marks come from spindle 2 on Line 3, which vibrates above 9'000 rpm. #### Analysis Nina Frei ran the spindle at 6'000, 9'000 and 12'000 rpm and measured with the hand-held vibration meter. Reading at 12'000 rpm: 4.8 mm/s (limit 2.8 mm/s). Cause: a worn front bearing on spindle 2. #### Fix - Bearing replaced by Nina Frei and the Aarmatic service technician on 21.05.2026. - Spindle calibrated again with the reference mandrel; runout 2 µm after the fix. - The 14 parts were scrapped; the customer was not affected. Decided: Replace the bearings on all four spindles of Line 3 during the retrofit window, not one by one when they fail. Why: spindles 1, 3 and 4 have the same running hours as spindle 2. - Action: @Elena Rossi order eight spare spindle bearings (due 2026-06-12) (done) - Action: @Nina Frei add the vibration readings to the maintenance log (due 2026-05-29) (done)