--- type: "person" name: "Nina Frei" role: "Senior Maintenance Engineer" team: "Production" projects: ["line-3-retrofit"] decisions: 6 open_actions: 3 source: "sources/00-staff-directory" tags: ["person"] --- # Nina Frei Nina Frei is Senior Maintenance Engineer at Bergwerk Präzision AG. Ask Nina about: spindles, calibration, machine vendor contacts. ## Open actions - [ ] Prepare the spindle bearing swap for the retrofit window (due 30.10.2026) · [[projects/line-3-retrofit|Line 3 retrofit]] · from [[sources/2026-09-14-weekly-production-meeting|Weekly production meeting]] - [ ] Hand over the sensor alarm thresholds to Lukas Brunner (due 13.11.2026) · [[projects/line-3-retrofit|Line 3 retrofit]] · from [[sources/2026-10-28-line-3-retrofit-check-in-before-the-stop|Line 3 retrofit: check-in before the stop]] - [ ] Record a short video of the calibration with the reference mandrel (due 20.11.2026) · [[projects/line-3-retrofit|Line 3 retrofit]] · from [[sources/2026-10-19-knowledge-handover-nina-frei|Knowledge handover: Nina Frei, maintenance]] ## Decisions - 20.04.2026 · [[decisions/2026-04-20-retrofit-line-3-instead-of-buying-a-new-machining-centre|Retrofit Line 3 instead of buying a new machining centre]] - 20.04.2026 · [[decisions/2026-04-20-fit-vibration-sensors-on-all-four-spindles-of-line-3-so|Fit vibration sensors on all four spindles of Line 3, so bearing wear shows up before a…]] - 18.05.2026 · [[decisions/2026-05-18-replace-the-bearings-on-all-four-spindles-of-line-3-during|Replace the bearings on all four spindles of Line 3 during the retrofit window, not one…]] - 14.09.2026 · [[decisions/2026-09-14-the-line-3-retrofit-window-is-02-11-2026-to-13-11-2026-line|The Line 3 retrofit window is 02.11.2026 to 13.11.2026; Line 3 restarts on 16.11.2026]] - 19.10.2026 · [[decisions/2026-10-19-spindle-checks-on-line-3-happen-every-month-and-after-every|Spindle checks on Line 3 happen every month and after every crash, using Nina's five…]] - 28.10.2026 · [[decisions/2026-10-28-line-3-runs-at-80-feed-rate-in-the-first-week-after-the|Line 3 runs at 80 % feed rate in the first week after the restart]] ## Done actions - [x] Add the vibration readings to the maintenance log (due 29.05.2026) · [[projects/line-3-retrofit|Line 3 retrofit]] · from [[sources/2026-05-18-ticket-tck-0412-spindle-vibration|TCK-0412: Line 3 spindle 2 vibration and surface marks]] - [x] List the spare parts to stock before the retrofit (due 30.09.2026) · [[projects/line-3-retrofit|Line 3 retrofit]] · from [[sources/2026-04-20-line-3-retrofit-planning|Line 3 retrofit: planning meeting]] ## Projects - [[projects/line-3-retrofit|Line 3 retrofit]] ## Mentioned in - 12.01.2026 · [[sources/00-staff-directory|Staff directory: Bergwerk Präzision AG]] - 20.04.2026 · [[sources/2026-04-20-line-3-retrofit-planning|Line 3 retrofit: planning meeting]] - 18.05.2026 · [[sources/2026-05-18-ticket-tck-0412-spindle-vibration|TCK-0412: Line 3 spindle 2 vibration and surface marks]] - 14.09.2026 · [[sources/2026-09-14-weekly-production-meeting|Weekly production meeting]] - 12.10.2026 · [[sources/2026-10-12-onboarding-note-production|Onboarding note: your first week in production]] - 19.10.2026 · [[sources/2026-10-19-knowledge-handover-nina-frei|Knowledge handover: Nina Frei, maintenance]] - 26.10.2026 · [[sources/2026-10-26-iso-audit-preparation|ISO 9001 recertification: audit preparation]] - 28.10.2026 · [[sources/2026-10-28-line-3-retrofit-check-in-before-the-stop|Line 3 retrofit: check-in before the stop]]