SDI Lab Knowledge capture Demo on a made-up company's notes (Bergwerk Präzision AG). Anything added here is visible to other visitors. A pause ends after 5 minutes, so no one can block the demo. Resets every night at 03:30. Capturing

Ask

Answers come from the notes, with the source of every passage.

Answer

No AI model in this demo: these are the best-matching passages from the notes. On a real install, a model writes the answer from these citations.
  1. [1] TCK-0457: Stahl Nord trial order delivered without 3.1 certificate · Problem
    The second trial order from Stahl Nord (1.4404 round bar, 18 mm, 1.2 tonnes) arrived without the 3.1 material certificate. Without the certificate we may not use the material for medical parts.
    Open note
  2. [2] TCK-0457: Stahl Nord trial order delivered without 3.1 certificate · What we did
    • Action: @Elena Rossi add the certificate-with-every-delivery rule to the Stahl Nord framework contract as an annex (due 2026-10-31) • Action: @Thomas Huber add the quarantine step to the goods-receipt work instruction (due 2026-11-06)
    Open note
  3. [3] Any delivery that arrives without a 3.1 material certificate goes into quarantine (blocked stock); nobody uses the material until Quality has checked the certificate
    Decided on 07.10.2026 in TCK-0457: Stahl Nord trial order delivered without 3.1 certificate. Why: • medical customers audit our material traceability; one part without a certificate can cost us the customer.
    Open note
  4. [4] Stahl Nord sends the 3.1 certificate electronically with the delivery note, so goods receipt can check it before unloading Added by a visitor
    Decided on 28.10.2026 in Stahl Nord onboarding call (added by a visitor in this demo). Why: • after TCK-0457 we want the certificate before the material is in the building.
    Open note
  5. [5] Decision memo: steel supplier from 2027 · Decision
    Decision: Switch our main steel supplier from Acier Léman to Stahl Nord from 01.01.2027. Why: Stahl Nord is about CHF 76'000 a year cheaper once the cost of late deliveries is counted. Why: Stahl Nord delivers in 5 days and sends the 3.1 material certificate with every delivery; Acier Léman was late on 9 of 22 deliveries and twice delivered without certificates.
    Open note