  1. [1] Switch our main steel supplier from Acier Léman to Stahl Nord from 01.01.2027
    Decided on 27.08.2026 in Decision memo: steel supplier from 2027. Why: • Stahl Nord is about CHF 76'000 a year cheaper once the cost of late deliveries is counted. • Stahl Nord delivers in 5 days and sends the 3.1 material certificate with every delivery; Acier Léman was late on 9 of 22 deliveries and twice delivered without certificates.
    Open note
  2. [2] Decision memo: steel supplier from 2027 · Actions
    • Action: @Elena Rossi sign the framework contract with Stahl Nord (due 2026-10-15) (done) • Action: @Elena Rossi tell Acier Léman about the change and agree the backup volume (due 2026-11-13) • Action: @Reto Ammann create Stahl Nord as a supplier in NovaERP (due 2026-12-11)
    Open note
  3. [3] Decision memo: steel supplier from 2027 · Cost per year (about 180 tonnes)
    • Acier Léman from 2027: CHF 742'000, plus about CHF 35'000 for late deliveries (weekend shifts, express freight). • Stahl Nord: CHF 701'000 including freight.
    Open note
  4. [4] Weekly production meeting · Stahl Nord #stahl-nord-switch
    Elena Rossi: the contract is with the lawyer, signature expected in October. The first regular delivery is planned for 05.01.2027.
    Open note
  5. [5] Keep Acier Léman as a backup supplier for stainless 1.4404 only, with a small yearly volume
    Decided on 27.08.2026 in Decision memo: steel supplier from 2027. Why: • we do not want to depend on a single steel supplier for medical-grade stainless.