  1. [1] Supplier review: steel bar stock · Where we stand with Acier Léman
    Acier Léman SA has supplied our steel bar stock since 2014. In the first half of 2026: • 9 of 22 deliveries were late, on average by 6 working days. • Two deliveries came without the 3.1 material certificate; Thomas Huber had to block the material until the papers arrived. • They announced a price increase of 14 % from January 2027. Lukas Brunner: the late deliveries caused two weekend shifts on Line 2 in May.
    Open note
  2. [2] Supplier review: steel bar stock · Next steps
    • Action: @Elena Rossi get a binding offer and a trial delivery from Stahl Nord (due 2026-07-31) (done) • Action: @Thomas Huber test the material from the trial delivery (due 2026-08-21) (done) • Action: @Sandra Meier compare the full yearly cost of both suppliers (due 2026-08-14) (done)
    Open note
  3. [3] Decision memo: steel supplier from 2027 · Background
    See the supplier review of 15.06.2026. The trial delivery from Stahl Nord arrived on 28.07.2026. Thomas Huber tested it: all bars within tolerance, 3.1 certificates complete.
    Open note
  4. [4] Decision memo: steel supplier from 2027 · Decision
    Decision: Keep Acier Léman as a backup supplier for stainless 1.4404 only, with a small yearly volume. Why: we do not want to depend on a single steel supplier for medical-grade stainless.
    Open note
  5. [5] TCK-0457: Stahl Nord trial order delivered without 3.1 certificate · What we did
    • Goods receipt booked the bars as blocked stock with the label "quarantine: certificate missing". • Elena Rossi called Stahl Nord; the certificate came by email two days later and the material was released. Decision: Any delivery that arrives without a 3.1 material certificate goes into quarantine (blocked stock); nobody uses the material until Quality has checked the certificate. Why: medical customers audit our material traceability; one part without a certificate can cost us the customer.