  1. [1] Stahl Nord sends the 3.1 certificate electronically with the delivery note, so goods receipt can check it before unloading Added by a visitor
    Decided on 28.10.2026 in Stahl Nord onboarding call (added by a visitor in this demo). Why: • after TCK-0457 we want the certificate before the material is in the building.
    Open note
  2. [2] Stahl Nord onboarding call Added by a visitor
    Call with Mario Gerber, account manager at Stahl Nord, about the first regular deliveries in January. Decision: Stahl Nord sends the 3.1 certificate electronically with the delivery note, so goods receipt can check it before unloading. Why: after TCK-0457 we want the certificate before the material is in the building. • Action: @Reto Ammann set up electronic delivery notes from Stahl Nord in NovaERP (due 2026-12-11) • Action: @Elena Rossi agree the January delivery schedule with Stahl Nord (due 2026-11-20)
    Open note
  3. [3] Decision memo: steel supplier from 2027 · Decision
    Decision: Switch our main steel supplier from Acier Léman to Stahl Nord from 01.01.2027. Why: Stahl Nord is about CHF 76'000 a year cheaper once the cost of late deliveries is counted. Why: Stahl Nord delivers in 5 days and sends the 3.1 material certificate with every delivery; Acier Léman was late on 9 of 22 deliveries and twice delivered without certificates.
    Open note
  4. [4] TCK-0457: Stahl Nord trial order delivered without 3.1 certificate · What we did
    • Action: @Elena Rossi add the certificate-with-every-delivery rule to the Stahl Nord framework contract as an annex (due 2026-10-31) • Action: @Thomas Huber add the quarantine step to the goods-receipt work instruction (due 2026-11-06)
    Open note
  5. [5] TCK-0457: Stahl Nord trial order delivered without 3.1 certificate · What we did
    • Goods receipt booked the bars as blocked stock with the label "quarantine: certificate missing". • Elena Rossi called Stahl Nord; the certificate came by email two days later and the material was released. Decision: Any delivery that arrives without a 3.1 material certificate goes into quarantine (blocked stock); nobody uses the material until Quality has checked the certificate. Why: medical customers audit our material traceability; one part without a certificate can cost us the customer.
    Open note